Iseki Hydraulic Manual
Trip Meter ・Push the selectable switch for 2 seconds to reset (0). Travelling Speed Push the selectable switch for 2 seconds and the &. • SPECIFICATIONS SPECIFICATIONS ENGINE TJ75 Make..Iseki.Diesel Model..E4DE-VTDB Type.Indirect.Injection.Direct.Injection..Overhead.Valve Aspiration.Exhaust-turbo.charger Displacement.2955.cm Number.of.Cylinders.4 Bore..97.mm Stroke..100.mm Engine.Horsepower.(Net).60.5kw.@.2600.min-1 PTO.Horsepower.(Estimate).48.4kw.@.540.or.1000.PTO.min-1 Firing.Order.. 1-3-4-2 Compression.Ratio.17.5±0.5 Low.Idle.Speed.
PRE-OPERATIONAL ROUTINE INSPECTION It is essential for avoiding accidents or breakdown during operation to keep the lawn mower in goon condition. The following pre-operational checks should be performed without fail before starting daily operation.
Bolens Iseki Hydraulic Pump
MOWER OPERATION b. Turn the height adjustment dial to set the cutting c. Release the parking brake (GE TYPE) or the parking height of the mower deck. Lock (E TYPE). Depress the HST forward travel pedal gradually to NOTE: •.
View and Download Iseki TJ75 operation manual. For purchasing an ISEKI tractor. This operator's manual provides the information. Actuate hydraulic.
• TJ75 WHEN TRAVELLING (1) When you travel on roads, ensure the differential lock is off, or the tractor may turn over. (2) Do not make sharp turns when operating at high speed or for transportation as the tractor may turn over. • () Use ramps with the same or better specifications mentioned below. When the machine is equipped with attachments other than those included in the specifications mentioned below, ask your ISEKI dealer for advice. • () If you use a trailer, use a proper one which suits your tractor. Using an improper trailer may cause serious accidents. Never attempt to haul beyond the tractor`s capacity.
Walmart 2016 employee handbook. • SAFETY (12) Fuel label (1) Starting engine caution label (Code No.10-04-001-0) (Code No.140-04-00-1) DANGER: RISK OF EXPLOSION AND BURNS Use only diesel fuel. Before replenishing fuel, be sure to stop the engine and wait until the engine and heated parts cool down sufficiently. • TJ75 LOCATION OF SAFETY DECALS Location of all instruction decals provided as a reference. Replace any decals that are damaged, missing or are not readable. Consult your dealer. • Your ISEKI Dealer is available should items in this book or details of your machine not be understood.
See if the link below works for you - came across this when I was looking for a parts manual for my own tractor. Round about page 105 is the lift arm unit, looking at the diagram may just give you the info you need. I just lifted mine off my TX1500 - looks to be exactly the same unit. Have you taken off the distribution/valve block - there is a bolt under that. Also one under the top-link bracket if you missed that.
• When any of the following abnormalities is encountered, e. Turn the starter switch to the OFF (p) position to stop stop the lawn mower and mower deck immediately. • SCMA54&SCMB48 8. EFFICIENT MOWING c.
As the owner or operator of the lawn mower, you are responsible for preventing accidents or injuries. Inspect the lawn mower periodically. If not, this may not only shorten the lawn mower’s service life but also make safe and efficient operation impossible. Never use the lawn mower out of normal usage even if it is not mentioned at this operation manual. FOR SAFE OPERATION 2. BEFORE STARTING THE LAWN MOWER 2.1. Set up an operation plan with sufficient time al- lowance.
• LUBRICATION & PERIODIC MAINTENANCE Starting Switches This Tractor is equipped with a neutral-shart system consisting of neutral switches and a relay. To start Tractor, ALLthe following is required: Range shift lever must be in neutral position PTO control switch must be in OFF position NOTE: A seat safety switch is incorporated into system. • TJ75 Fuse Location FIG. 6-32, 33: Fuse Box, A- Located on upper side of the clutch pedal. Function Instrument Panel Stop Lights Turn Lights Horn / Head Lights Starter Relay Radio Cassette FIG.
• LUBRICATION & PERIODIC MAINTENANCE FIG. 6-13: Front Axle Oil Front drive axle has a common oil level for front differential housing and each wheel reduction unit. Oil level should be checked every 200 hours of Tractor operation.
• OPERATION Operator Observations Starting Circuit Operation Constant attention should be paid to the following points Tractor is equipped with a starting system to protect the during operation: operator. To permit tractor to be started (start motor to operate), ALL the following is required: ・. • TJ75 GROUND SPEED SELECTION Tractor is equipped to provide twelve forward gear speeds and twelve reverse gear speeds. 5-4: Gear shift button, 1, provides four gear selections. These gear selections are compounded by range shift lever, 2. The range shift lever provides three major changes in ground speed. • OPERATION Engine Speed Engine Speed 2600rpm 2600rpm Forward Reverse FIG.
Capacity(Crankcase and Filter)..9.0liters Recommended Viscosity: 25° C and Above..SAE 30W, 10W-30 0° -25° C..SAE 20W, 10W-30 0°. • TJ75 LUBRICATION/FILL POINTS FIG. 6-1: General layout of lubrication, fill and drain locations on Tractor: Ref. Description: Type: Fuel Tank Diesel Fuel Engine Radiator Coolant Radiator Coolant Overflow Reservoir Crankcase Engine Oil Rear Housing Hydraulic Oil Front Axle Hydraulic Oil. • LUBRICATION & PERIODIC MAINTENANCE PERIODIC INSPECTION AND MAINTENANCE TABLE: Inspect, replenish or adjust Replace Clean or wash: Replacement or servicing at authorized service facility recommended.
Remove all four quick couplers (13). ATTACHING THE HIGH DUMP COLLECTOR (SBC600X-HQE4) k. Separate the grass limit sensor coupler (12). Attach the collector in reverse order of detaching. NOTE: When connecting the quick couplers to the dump and lift ports of the valve ASSY, make sure that colors of caps for the quick couplers and colors of the ports are same.
I live in the UK and the Iseki distributor for this region is Ransomes Jacobsen. If you set their website to Europe you can see full user manuals for many Iseki compact tractors and mowers. It also has full free workshop service manuals in pdf form for some models, but they are generic, so not listed against every product, just look for other similar models e.g. The 5470/5475 manual, which is also very similar to the Massey 1500 series, is at Not sure how useful this will be for those outside of Europe but perhaps worth a look - certainly the Iseki Australia models look very similar.
Start engines equipped with glow plugs. • TJ75 () Radiator label Take care of handling the battery. (Code No.10-02-00-0) Improper handling may lead to explosion. Never short the poles. Charge the battery in a well ventilated place. (10) Starter warning label (Code No.10-02-00-0) WARNING: HIGH PRESSURE STEAM AND HOT.
Remarks Engine oil Replace every 100 Hr. Engine oil filter Replace every 200 Hr. Air cleaner ele- Wash every 100 Hr. • TJ75: Inspect, replenish or adjust Replace Clean or wash: Replacement or servicing at authorized service facility recommended. Remarks Inspect and adjust Toe-in adjustment every 200 Hr. Tightening of tie- Inspect and adjust rod ends every 200 Hr. Front axle Inspect every 600 Hr.
FUEL SYSTEM. Fuel Filter.ROOMLAMP.Replacing Fuel Filter Cartridge. GENERAL DIMENSIONS.107 12. ASSEMBLY & PRE-DELIVERY INSPECTION.
Play, streaming, watch and download Tamil hot stage dance| Tamil village stage record dance video (01:37), you can convert to mp4, 3gp, m4a for free. Dirty stage record dance in tamilnadu village with item gir. Tags: Tamil Record Dance 2015 Video Songs, Video, Tamil Record Dance 2015 bollywood movie video, 3gp Tamil Record Dance 2015 video Download, mp4 Tamil Record Dance. Indian village local kovil festival functions record dance programs celebrate local village peoples. Lot of village songs dancing some beautiful girls in the festival.Latest Tamil Village Recording Dance Videos on kovil Festival Dancing Tamil Girls For Item Songs In Midnight. Tamil Record Dance 2018,Pattu Kacheri in Tamil Nadu, adal padal new 2018, record dance in village, mp3 Quality: Good Download. Tamil record dance youtube.
CAUTION: Pulling heavy loads will require extended braking distances. Reduce travel speed. • TJ75 INSTRUMENTS & CONTROLS & OPERATION FIG.
Setting(mm) Front.tyre.AG.9.5-22.1320 tyre.type.location.size. Setting(mm) Rear.tyre.AG.12.4-36.1335. • GENERAL DIMENSIONS GENERAL DIMENSIONS (unit: mm) Tire Front 9.5-22 Rear 12.4-36 Wheel base 2150 Front tire track 1320 Rear tire track 1335 Length 3870 Width 1690 Height 2475 Forward overhang Rear overhang Ground clearance Under the front axle Under the rear axle.
5-68 TOOL BOX FIG. 5-69: Tool box (1) is located behind the operator's seat.
Then install the filter. Screw in hand side of the chassis. The filter by hand until the rubber packing comes into contact with the sealing surface, and then screw in it by a 2/3 turn with the filter spanner. MAINTENANCE b. Upper screen in the engine hood c. The clogged radiator screen should be cleaned by Open the engine hood and remove the net by un- applying compressed air or water from both sides screwing the wing bolts.
Keep away from sparks or flames, which could cause explosion. When charging battely from an external source; Set charging voltage below 16V. Set charging ampere below 1/10 (one tenth) of battely capacity.
INSPECTION AND MAINTAINANCE OF MAJOR PARTS IV. INSPECTION AND MAINTAINANCE OF MAJOR PARTS 1. INSPECTION OF CYLINDER (SBC550X-L) a. Cylinder can be adjusted its length.
Deck or clogs the mower chute, stop operation imme- diately and remove clogged grass. MOWER OPERATION 6. EMERGENCY STOP d. Move the PTO lever to the STOP ( ) position.
TROUBLESHOOTING VI. TROUBLESHOOTING Troubles Presumable causes Remedies • Improper discharging • Front PTO belts and drive • Check belt and correct. • Blades are installed upside down. • Re-install them correctly.
COLLECTOR OPERATION III. COLLECTOR OPERATION 1. BEFORE OPERATION 3. INSPECTION BEFORE OPERATION CAUTION: • Before operating, inspect the points that follow.
Also one under the top-link bracket if you missed that. Mine still took a little bit of persuasion to come off once all the bolts and nuts were free. Thanks dantz, If you happen to have a copy of the service manual too then that would be great? I've ordered it but that's not going to arrive soon.
Thoughts appreciated.
Other option will be to clean out the suction line incase of a blockage in it. Thoughts appreciated.
• TJ75 ASSEMBLY & PRE-DELIVERY INSPECTION ASSEMBLY 1. Remove wheels, fenders, and sundry boxes from container. IMPORTANT: Do not commence assembly of this Tractor until reading these instructions 2. Disassemble container. Completely and carefully.
If the belt is normal, loosen the tension pulley. Remove all rust and touch up where paint bas peeled off with touch-up paint supplied by ISEKI. Be sure to replace all the removed parts.
Touch up scratches with paint. At the end of storage period. • TJ75 TROUBLESHOOTING ENGINE Possible Cause Problem Remefy No step on the clutch pedal Starter motor does not Step on the clutch pedal. Gear shift lever not in neutral operate with key turned to Place gear shift lever in neutral. PTO clutch engaged START Switch off PTO. • TROUBLESHOOTING ENGINE Problem Possible Cause Remedy Exhaust fumes are white Clogged air cleaner Clean or replace element (s). High engine oil level Inspect oil level and correct.
Pull up parking lever (7) until the 8 notch and adjust the adjustment cable nut (8) of brake cable (4) so that SXG326 3695-303-003-00.Belt (VB041).2pcs. When the lawn mower creeps forward, tilt the adjust m.Free the neutral arm and depress HST pedal. Nut slightly toward A and when creeps reverse, tilt to- ward B by manipulating the adjust nut. Then tighten it n. Then adjust the effective length of the stopper bolt temporarily with the lock nut. MAINTENANCE WARNING: Never attempt to keep on using 15. TIRE PRESSURE (INFLATION) or charging the battery with a electrolyte level lower than the limit, or the battery may Improper tire pressure causes the tires to wear ab- explode or its service life be shortened due normally and affects the lawn mower performance.
5-43: Drawbar, 1, at rear of Tractor allows pull- type implements to be attached to Tractor. Maximum vertical load on drawbar must not exceed 880 lbs (400 kg).
Make sure that the oil level is be- • Use oil of proper viscosity in accordance tween the upper and lower limits. • The letter “F” shows the upper limit.